|
| Project Number: |
2208690 |
Valuation: |
$0
|
| Stage: |
|
Bid Date: |
07/12/2006 by 10:00 a.m.
|
| Building Use: |
|
Date Posted: |
07/07/2006
|
| Sector: |
|
Last Updated: |
07/07/2006 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
BATON ROUGE, LA County United States |
|
|
| Project Description: |
FURNISH ALL MATERIAL, LABOR, SUPPLIES, TOOLS AND EQUIPMENT NECESSARY FOR THE CONSTRUCTION AND PLACEMENT OF ONE EROSION CONTROL STRUCTURE AT THE PORT HUDSON STATE HISTORIC SITE, INCLUDING ALL MISCELLANEOUS MATERIALS NEEDED FOR A COMPLETE PRODUCTThis work will consist of provision and plsemeint of a specialized wing-wall (and headwall) to be built in accordance with these plans and specifications, a concrete-lined floor (5 %" thickness) set at the proper flow-line and one (I) run of thirty (30) inch plastic drain line pipe (the nza shall be approximately 200 feet in 1ength)pO.T) and necessary earthwork to build a terrace row which will check run-off into this canyon, Approximately 200 feet of drainage pipe and two (2) angled joints will be required.in total for this work. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|