| Project Description: |
Principle architectural features i nclude: demolition and replacement of windows, doors, ceilings, flooring, handrails,stair treads, bathroom fixtures and partitions, and laundry facilities; selective demolition and replacement of interior walls for new gang bathrooms and laundry rooms; cl eaning of louvers; and cleaning and painting of walls. The principle mechanical features (HVAC is 75% of the entire project) include: demolition and replacement of the existing hot and chilled water heating and air conditioning system to include all steam to hot water converters, pumps, flash tank, expansion tanks, condensate receiver and pumps, condensing unit, evaporator barrel, fan coil units, fin tube radiators, piping, and controls; demolition and replacement of exhaust and make up air fans, ductwork, registers, and louvers; dryer vents; replacement of domestic hot water generators, sump pumps, hot and cold water piping, and drain, waste and vent piping. Provide and install a wet pipe sprinkler system throughout the building. The principle electrical features include: demolition and replacement of all power, lighting, cable TV, telephone and public address panels, conduit, wire, receptacles, and switches; demolition of a 300KVA transformer and feed to all removed mechanical equipment; replacement of all lighting throughout the building; new underground electical service and pad mounted transformer; and demolition and replacement of the fire alarm system. |