Construction and Home Improvement Community
Home :: Projects :: Commercial :: KINSOLVING DORMITORY ROOF REPLACEMENTS
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
KINSOLVING DORMITORY ROOF REPLACEMENTS Back
Project Number: 06CSP008 Valuation: $0
Stage: Bid Date: 04/12/2006 by 1:30 p.m.
Building Use: Date Posted: 03/30/2006
Sector: Last Updated: 11/30/1999
Project Location: Street Address
Available only for subscribers.  Sign Up Now!
AUSTIN, TX
County
United States
Normal Map
Aerial Map
Project Description: The abbreviated Summary of Work is as follows: Project A: KINSOLVING HALL KITCHEN & ONE-STORY CONNECTORS ROOF REPLACEMENTS, Kinsolving Dormitory (KIN) Re-roofing of roofs over Kinsolving Hall kitchen, mechanical penthouse adjacent to kitchen roof, and roofs of one-story connectors between kitchen roof and north and south towers. The work includes removal of existing roofing membranes, temporary removal and reinstallation of rooftop equipment to allow for re-roofing operations, preparation of decks to receive new membrane roofing systems, installation of new through-wall flashing including masonry removal and installation, new roof drains, new sheet metal flashing, edge trim, scuppers, gutters, downspouts and collection heads, sealant re-pointing of stone parapet caps, and installation of coal-tar elastomeric membrane roofing system installed over area shown as Project A on drawings. Project B: KINSOLVING HALL NORTH & SOUTH TOWER ROOF REPLACEMENTS, Kinsolving Dormitory (KIN) Re-roofing of roofs at Kinsolving Hall over north and south towers, and penthouses on top of north and south towers. The work includes removal of existing roofing membranes, temporary removal and reinstallation of rooftop equipment to allow for re-roofing operations, preparation of decks to receive new membrane roofing systems, installation of new through-wall flashing including masonry removal and installation, new roof drains, new sheet metal flashing, edge trim, scuppers, gutters, downspouts and collection heads, sealant re-pointing of stone parapet caps, and installation of new modified bituminous membrane roofing system installed. Pre-Proposal Conference is scheduled for MARCH 28, 2006 at 1:00 PM in Room 2.102. (located on the second floor of Physical Plant Building 1 at Dean Keaton @ Lafayette in Austin, Texas).
Project Notes: Available only for subscribers.  Sign Up Now!
Plans & Documents: Available only for subscribers.  Sign Up Now!
Project Scope:
Project Contacts  
OWNER: Available only for subscribers.  Sign Up Now!
Construction Manager: Available only for subscribers.  Sign Up Now!
Architect: Available only for subscribers.  Sign Up Now!
Civil Engineer: Available only for subscribers.  Sign Up Now!
Mechanical Engineer: Available only for subscribers.  Sign Up Now!
Electrical Engineer: Available only for subscribers.  Sign Up Now!
General Contractor: Available only for subscribers.  Sign Up Now!
Others: Available only for subscribers.  Sign Up Now!
Bidder's List  
Back
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500