|
| Project Number: |
1-70102 GOB |
Valuation: |
$0
|
| Stage: |
|
Bid Date: |
05/05/2006 by 2:00 p.m.
|
| Building Use: |
|
Date Posted: |
03/30/2006
|
| Sector: |
|
Last Updated: |
11/30/1999 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Miami, FL 33130 County United States |
|
|
| Project Description: |
Work included in this contract consists of furnishing all supervision, labor, materials, equipment, tools and performing all operations necessary for the construction and installation of two (2) complete pump stations including all electrical, plumbing and architectural components. Provide and install five pumps (in total), with two backup diesel generators (one in each pump station), all associated drainage structures, including but not limited to pipe culverts, exfiltration drains, miscellaneous drainage improvements, grading, sodding, and miscellaneous roadway restoration items related to drainage work. Pre-Bid meeting will be held on April 19, 2006 at 2:00 P.M. at the Thomas Center Building, First Floor Conference Room, 172-A West Flagler Street, Miami, Florida 33130. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|