|
| Project Number: |
97B98 |
Valuation: |
$300,000
|
| Stage: |
|
Bid Date: |
04/04/2006 by 2.00 p.m.
|
| Building Use: |
|
Date Posted: |
03/17/2006
|
| Sector: |
|
Last Updated: |
11/30/1999 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Statewide, WI County United States |
|
|
| Project Description: |
The work consists of 1.Eau Claire: a.Replace existing oil fired boiler and replace with two new oil fired units.b.Remove existing pumps and add new primary and secondary pumps and piping loop. c.Replace three condensing units. Add a backup cooling unit to the communications center. 2.Spooner: a.Remove existing oil fire boilers and replace with new high efficiency gas boilers. b.Remove existing underground oil tank and monitoring equipment. c. Add secondary pumping loop. d.Run natural gas into the Spooner site for new boilers. e.Replace condensing units Add a backup cooling unit to the communications center. 3.Wausau: a.Replace condensing units b.Add a backup cooling unit to the communications Center. c.Add a secondary piping loop for additional control. A pre-bid inspection tour will be conducted at the site at 11:00 AM on Tuesday, March 14, 2006 |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|