|
| Project Number: |
05E1B |
Valuation: |
$50,000
|
| Stage: |
|
Bid Date: |
03/17/2006
|
| Building Use: |
|
Date Posted: |
03/03/2006
|
| Sector: |
|
Last Updated: |
11/30/1999 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Menomonie, WI County United States |
|
|
| Project Description: |
In general the work consists of firstly, the complete removal of the existing boiler make-up water treatment system which consists of softener, dealkalizer, and sand filter equipment and associated piping, electrical and controls materials as detailed on drawings; and secondly, the installation of new softening equipment, reverse osmosis equipment and carbon filter with associated piping, electrical and controls. A pre-bid tour of the project site is scheduled for March 8th, 2006 at 10:00am. The meeting place will be the UW Stout Central Heating Plant. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|