| Project Number: |
W912DQ-07-R-0042 |
Valuation: |
$0
|
| Stage: |
|
Bid Date: |
27-Aug-2007
|
| Building Use: |
|
Date Posted: |
07/26/2007
|
| Sector: |
|
Last Updated: |
07/26/2007 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Kansas City, MO County US |
|
|
| Project Description: |
The project will require the excavation of a diversion channel to redirect the Blue River around the grade control structure location, followed by excavation for the structure itself. Construction of the initial portion of the structure will entail the preparation of the foundation materials, placement of forms and reinforcement, and placement of mass concrete to create the stilling basin, headwalls, training walls and other components of the structure. Thicknesses of some of the slabs are approximately 7 feet, and the height of some of the walls approaches 50 feet. Excavation of the new channel alignment will include approximately 1,100 feet of channel at a top of bank width of 320 feet and average depths of 25 feet. Upon completion o f the initial portion of the structure, the river will be redirected through the structure and the remaining portion of the structure completed. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|