| Project Description: |
The Contractor will be responsible for providing all necessary facilities, plants, labor, transportation, materials, and equipment to construct a levee protection systems consisting of:12400 lineal ft (LF) of earthen levee; 1480 LF of sheetpile, 1495 LF of floodwall, 705 LF of utility corridor floodwall , 100 LF sheetpile railroad closure, 1600 LF access ramps, 2-160 FT span and 1-305 FT span pedestrian, 1 intermediate bent, 6 bridge abutments, 2800 LF of ditches, 360 LF of French Drains, 1-Flood Control Structure constructed in the channel, 1-36 RCP gatewell, 1-48 RCP gatewell, 1-96 RCP gatewell, 2-54 RCP, 1-48 RCP, 6-24 RCP within levee prism, and other work items identified in the Bid Schedule. |