|
| Project Number: |
W912EF-07-B-0016 |
Valuation: |
$0
|
| Stage: |
|
Bid Date: |
08-Jul-2007
|
| Building Use: |
|
Date Posted: |
06/22/2007
|
| Sector: |
|
Last Updated: |
06/22/2007 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Snake River, WA County US |
|
|
| Project Description: |
Contract will be to provide, install, and connect electrical equipment, devices, and materials to upgrade existing spillway gate hoist motor control including gate position sensing and indication. Work will include (but is not limited to): 1. Provide and connect cables to connect existing push-buttons to existing relay controls. Work will include modifying the existing (two) motor control centers (MCC). 2. Lay out and fabricate two programmable logic controller (PLC) equipment cabinets. 3. Lay out and fabricate distributed I/O control cabinet. 4. Provide eight encoders and connect to two PLC. 5. Provide and connect fiber optic cables to fiber optic-Ethernet switches and existing site fiber optic patch panels. 6. Test and calibrate of positioning devices. 7. Disconnect and remove existing relays, cables, and devices removed from service. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|