| Project Number: |
W912EF-07-B-0014 |
Valuation: |
$0
|
| Stage: |
|
Bid Date: |
10-Apr-2007
|
| Building Use: |
|
Date Posted: |
03/23/2007
|
| Sector: |
|
Last Updated: |
03/23/2007 |
| Project Location: |
Street Address Available only for subscribers. Sign Up Now!
Clearwater County, ID County US |
|
|
| Project Description: |
Contractor will be required to furnish and install two 4160 V feeder cables from switchgear equipment in the powerhouse for approx. 800 ft horizontally at Elev 990, then up 4 conduit embedded in concrete to Elev 1580 near the top of the dam, one at a time. The cable tray and conduit for the first cable is empty except for an existing pull rope; the second cable will require removal and replacement of existing cable. The ends will be terminated on the proper electrical switch gear equipment. The powerhouse cable will be 3/C 4/0 AWG Armored Copper a nd the vertical run in the dam structure will be 3 1/C 350KCMIL Aluminum. |
| Project Notes: |
Available only for subscribers. Sign Up Now!
|
| Plans & Documents: |
Available only for subscribers. Sign Up Now!
|
| Project Scope: |
|
|
| Project Contacts |
|
| OWNER: |
Available only for subscribers. Sign Up Now!
|
| Construction Manager: |
Available only for subscribers. Sign Up Now!
|
| Architect: |
Available only for subscribers. Sign Up Now!
|
| Civil Engineer: |
Available only for subscribers. Sign Up Now!
|
| Mechanical Engineer: |
Available only for subscribers. Sign Up Now!
|
| Electrical Engineer: |
Available only for subscribers. Sign Up Now!
|
| General Contractor: |
Available only for subscribers. Sign Up Now!
|
| Others: |
Available only for subscribers. Sign Up Now!
|
|
| Bidder's List |
|
|
|
Back
|