| Project Description: |
The project will include the construction of four camps and a core administration area for Basic Expeditionary Airman Training (BEAST). The project includes the demolition of structures located on the site. The design and contracting of the new facilities will be required before the existing facilities can be demolished. The Design portion must be accomplished by qualified, experienced, professional A-E multi-discipline firms. These A-E firms must be capable of: design analysis, planning, development, CADD, professional services, pre-design site-assessment, feasibility and concept studies, design, geotechnical investigations and reports, environmental investigations, studies, and reports, abatement and sampling, construction documentation, cost estimates, value engineering, life cycle costing, post design-shop drawing revie w, construction phase services, and construction administration. Additional services include but are not limited to: seismic design, topographic and boundary surveys to include mapping and analysis (including data collection and verification), historical and cultural resource investigations, design review, seismic analysis, design construction cost reconciliation, environmental testing, statement of work review, site surveys and evaluations, remediation design, and Environmental Protection Agency (EPA) com pliance for hazardous materials such as petroleum products, automotive chemicals, asbestos, lead and radon. The contractor is also required to have expertise and knowledge of the design of Anti-Terrorism/Force Protection (AT/FP) requirements, security and communications systems, fire protection and life safety systems, and other technical services as may be required. |