Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 61 - 70 of 453 Power Search
Road Reconstruction   Aerial Photo Jobsite Map Phone
Location:Lane County, OR Posted:11/17/2006
Commercial > Building > Project consists of: Mobilization, removal of individual trees, removal of old asphalt surfacing, placement of select borrow and aggregate base, m.......
Construction of Trail   Aerial Photo Jobsite Map Phone
Location:Portage Valley, AK Posted:11/17/2006
Commercial > Building > The work consists of Clearing & Grubbing, Excavation, Drainage Structure Installation (culverts, ditches), Aggregate placement (base and surfacing.......
Regional & Distribution Center   Aerial Photo Jobsite Map Phone
Location:Phoenix, AZ Posted:11/17/2006
Commercial > Building > The contract will be accomplished in two phases: Phase I development of 100% design drawings, Phase II will be the construction/postalization of the f.......
Correction of Life Safety Code Deficiencies   Aerial Photo Jobsite Map Phone
Location:Providence, RI Posted:11/17/2006
Commercial > Building > This project corrects fire protection/life safety deficiencies throughout the campus. Work includes general construction, alterations, architectural, mechanical and electrical work.
NATIONAL WILDLIFE REFUGE   Aerial Photo Jobsite Map Phone
Location:Avoyelles Parish, LA Posted:11/17/2006
Commercial > Building > The project consists of upgrading roads, drainage improvements, and rehabilitation of nine parking areas.
National Seashore   Aerial Photo Jobsite Map Phone
Location:Barstable County, MA Posted:11/17/2006
Commercial > Building > The project consists of Rehabilitation of Road.
Remove trees   Aerial Photo Jobsite Map Phone
Location:San Luis Obispo County, CA Posted:11/17/2006
Commercial > Building > Remove Trees.
Demo of 17 buildings Service Contract Act   Aerial Photo Jobsite Map Phone
Location:Great Lakes, IL Posted:11/17/2006
Commercial > Building > The site shall be filled, graded and CA6 gravel. The buildings include, but are not limited to metal frame structure with metal frame windows, sew.......
River Downstream Settling Basin Maintenance Dredging   Aerial Photo Jobsite Map Phone
Location:Everett, WA Posted:11/17/2006
Commercial > Building > Requires maintenance hydraulic dredging of approximately 70,000 cubic yards of sediment from the downstream settling basin on the river
Replace Family Housing Phase 7   Aerial Photo Jobsite Map Phone
Location:Great Falls, MT Posted:11/17/2006
Commercial > Building > THIS IS A POTENTIAL SOURCES SOUGHT SYNOPSIS ISSUED ONLY TO CONDUCT A MARKET RESEARCH STUDY FOR AN ANTICIPATED MILITARY PROGRAM.the program will consis.......
1   2   3   4   5   6   7    8   9   10   next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500