| : 61 - 70 of 329 |
Power Search |
|
Demolition and Site Clearance
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Saint Paul, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Work includes but is not limited to remaining utility cutoffcs, rodent baiting, asbetos abatement, complete excaation and removal of all footings, fou....... |
|
Remodeling of the Library
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Saint Paul, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Develop a plan for the remdeling and expansion of the Library in Roseville. Plan will evlaute the existing building, create a space use program and a ....... |
|
Repair floor and re-install toilet
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Gilbert, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Remove toilet, cut into concrete floor, install plumbing to vent stack in attic, repair floor and re-install toilet at Gilbert Iron Range OHV Rec Area. |
|
Heron Lake Dam Modifications
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Jackson County, MN |
Posted:09/07/2006 |
|
Commercial > Building >
The Dept of Natural Resources will accept sealed bids to remove re-bar 2" deep and grout (102 required); clean exposed structural steel and coat with ....... |
|
Site preparation for the new truck station
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Silver Bay, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Site preparation for the new silver bay truck station. Work includes clearing and grubbing, common excavation, granular borrow and installation of aggregate base material and seeding. |
|
Installation of new holding tanks
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Granite Falls, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Project consists of installation of new holding tanks, piping and level monitoring system. Abandonment of monitoring wells, and rehabilitation of existing wastewater lift station. |
|
Removal of existing water storage tanks
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:South Dakota, MN |
Posted:09/07/2006 |
|
Commercial > Building >
Project consists of removal of existing water storage tanks and related equipment. Abandonment of existing concrete vaults. Re-routing of water service pipe and related equipment. |
|
Collecting soil and groundwater
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Eveleth, MN |
Posted:09/07/2006 |
|
Commercial > Building >
The LIF work involves delineating the extent and magnitude of NAPL. The Push-Probe work involves collecting soil and groundwater samples to further assess the extent of groundwater impacts. |
|
Carpet and install for five floors
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Minneapolis, MN |
Posted:09/07/2006 |
|
Commercial > Building >
CARPET AND INSTALL FOR FIVE FLOORS FOR THE CENTENNIAL HALL REMODELING PROJECT. |
|
Extension of existing underground chilled water piping
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Southwest, MN |
Posted:09/07/2006 |
|
Commercial > Building >
The work will also involve the extension of underground chilled water piping from the east side loop near the library to the Charter Hall Building. Th....... |
|
1 2 3 4 5 6 7 8 9 10 next
|