| : 61 - 70 of 443 |
Power Search |
|
BLACKPOOL SITE WATER ACCESS
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Fairhaven, MN |
Posted:06/02/2006 |
|
Commercial > Building >
CLEARWATER LAKE - BLACKPOOL SITE WATER ACCESS AND ENTRANCE ROAD. Major items of work are clearing and grubbing - 0.5 acres; Excavation - 3500 C.Y.; Ag....... |
|
Construction of a Student Center
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Marshall, MN |
Posted:06/02/2006 |
|
Commercial > Building >
Construction of a patio on the Student Center West. Work will include earthwork, landscaping, and concrete. |
|
Remodel of MacLean Hall
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Maclean Hall, MN |
Posted:06/02/2006 |
|
Commercial > Building >
MacLean Hall is a 3-story, plus basement, concrete frame building with a concrete pan and joist floor system and brick exterior walls. It was construc....... |
|
Demolition and Partial Renovation of an Existing Dining Hall
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Moorhead, MN |
Posted:06/02/2006 |
|
Commercial > Building >
Selective demolition and partial renovation of exterior and interoir elements of an existing Dining Hall. Work generally includes-- a) selective demol....... |
|
Well Installation
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Lake Elmo, MN |
Posted:06/02/2006 |
|
Commercial > Building >
Soil boring and monitoring well installation by sonic drilling methods. |
|
Air Conditioning Addition
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Durham, NH |
Posted:06/02/2006 |
|
Commercial > Building >
Air Conditioning Addition for the UNH Fire Station |
|
Replacement Floor Tile
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Dover, NH |
Posted:06/02/2006 |
|
Commercial > Building >
Bid for Replacement Floor Tile for the Dover Police Department. |
|
Sanitary Sewer Trench Less Lining Project
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Concord, NH |
Posted:06/02/2006 |
|
Commercial > Building >
Sanitary Sewer Trench Less Lining Project. |
|
Revitalization Project
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Concord, NH |
Posted:06/02/2006 |
|
Commercial > Building >
Phase V North End Revitalization Project |
|
Water Treatment Plant Upgrade
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Madbury, NH |
Posted:06/02/2006 |
|
Commercial > Building >
Water Treatment Plant Upgrade |
|
1 2 3 4 5 6 7 8 9 10 next
|