| : 31 - 40 of 209 |
Power Search |
|
AWWTP SECONDARY SETTLING TANK NO. 1 REHABILITATION
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Hillsborough, FL |
Posted:11/09/2006 |
|
Commercial > Building >
All labor and equipment required for the rehabilitation of the Secondary Settling Tank. Work also includes demolition of the mechanical components, el....... |
|
COUNTYWIDE WASTEWATER PUMP STATION TELEMETRY
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Hillsborough, FL |
Posted:11/09/2006 |
|
Commercial > Building >
This project consists of the furnishing and installation of a Supervisory Control and Data Acquisitions System (SCADA) for approx. 200 wastewater pump....... |
|
AWTP CAUSTIC FEED PUMP STATION
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Hillsborough, FL |
Posted:11/09/2006 |
|
Commercial > Building >
Remove existing caustic feed pumps, PVC pipes and electrical conduit, Clean and resurface the containment area, refurbish concrete base from multiple ....... |
|
STRUCTURAL CABLING
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Hillsborough, FL |
Posted:11/09/2006 |
|
Commercial > Building >
Services required include installation and repair of voice and data cabling, engineering and design, fiber optic connectivity, and/or special wiring p....... |
|
Road Improvements
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Jacksonville, FL |
Posted:11/09/2006 |
|
Commercial > Building >
Road Improvements |
|
BLANTON MEMORIAL HEALTH UNIT
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:SPRINGHILL/WEBSTER, LA |
Posted:11/09/2006 |
|
Commercial > Building >
The work consists of a wood framed single story building, of about 3000 sq. ft. of floor area with cast-in-place concrete foundation. Exterior wall co....... |
|
A NEW FIELD HOUSE ADDITION
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:MONROE, LA |
Posted:11/09/2006 |
|
Commercial > Building >
The project consists of a new addition to the existing field house. The exterior walls consist of brick and concrete masonry units with a roof structu....... |
|
RENOVATIONS TO LABOR & DELIVERY, OCHSNER ST. ANNE GENERAL HO
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:LAFOURCHE, LA |
Posted:11/09/2006 |
|
Commercial > Building >
PROJECT CONSISTS OF THE DEMOLITION OF THE EXISTING LABOR & DELIVERY AND THE CONSTRUCTION OF NEW LABOR, DELIVERY, RECOVERY ROOMS WITH SUPPORTING FUNCTI....... |
|
EMERGENCY CARE CENTER EXPANSION
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:SHREVEPORT, LA |
Posted:11/09/2006 |
|
Commercial > Building >
Renovation and expansion of the existing emergency department. |
|
Malvern Street Drainage Project
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bossier City, LA |
Posted:11/09/2006 |
|
Commercial > Building >
C |
|
1 2 3 4 5 6 7 8 9 10 next
|