| : 31 - 40 of 827 |
Power Search |
|
Hall North Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Berkeley, CA |
Posted:05/26/2006 |
|
Commercial > Building >
The CITRIS Project is a new, 146,068 square foot, seven story, microfab laboratory and office building for the College of Engineering. The building co....... |
|
High Mast Lighting Maintenance and Repair
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Norco, CA |
Posted:05/26/2006 |
|
Commercial > Building >
ealse |
|
Install Brush and Blower Modifications
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:San Jose, CA |
Posted:05/26/2006 |
|
Commercial > Building >
The work consists of This project consists of furnishing all labor, materials, and equipment necessary to modify the existing train wash and erect and....... |
|
Pump Station Upgrade
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Alhambra, CA |
Posted:05/26/2006 |
|
Commercial > Building >
Paramount Pump Station Upgrade |
|
Repair of Side Inlets
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Alhambra, CA |
Posted:05/26/2006 |
|
Commercial > Building >
Project will include Cleaning, video inspection, and lining of existing corrugated metal pipe, and other appurtenant work. |
|
Park General Improvements
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Alhambra, CA |
Posted:05/26/2006 |
|
Commercial > Building >
Provide architectural/engineering design services for the Ted Watkins County Park General Improvements Project to be located in Los Angeles, Californi....... |
|
Park General Improvements Project
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Los Angeles, CA |
Posted:05/26/2006 |
|
Commercial > Building >
There are two main buildings on site; community building and pool dressing building. The pool building and pool facility is excluded from the work. Th....... |
|
Rack Installation
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Berkeley, CA |
Posted:05/26/2006 |
|
Commercial > Building >
The work to be done consists, in general, of installing bike racks in public right-of-way throughout the City of Berkeley for a 3-year period. This i....... |
|
Replacement Trunk Sewer
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:South Gate, CA |
Posted:05/26/2006 |
|
Commercial > Building >
The work consists of construction of approximately 8,400 linear feet of 84- and 90-inch diameter rubber gasket reinforced concrete pipe sewer, and all appurtenant work. |
|
Installation of Landfill Gas Collection System
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Industry, CA |
Posted:05/26/2006 |
|
Commercial > Building >
The work consists of installation of approximately 6,000 linear feet of gas header, approximately 24,000 linear feet of gas trenches, approximately 11....... |
|
1 2 3 4 5 6 7 8 9 10 next
|