| : 21 - 30 of 601 |
Power Search |
|
Outdoor Track Surface
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Platteville, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of providing full depth poured-in-place two component UV stabilized elastomeric polyurethane synthetic surfacing system w....... |
|
McPhee Addition - Ade Olson Roof Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Eau claire, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of the existing EPDM roof system membrane, paver and insulation with stone ballast 60-mil EPDM over increased “R” value and related work. |
|
Hibbard / Schofield Roof Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Eau claire, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of replacement of the existing EPDM roof system membrane, paver and insulation with stone ballast 60-mil EPDM over increa....... |
|
Roof Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:La crosse, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of replacement of the existing BUR/gravel roof system membrane with fully-adhered PVC over increased “R” value insulation and related work. |
|
Roof Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Arpin, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of replacement of the existing mechanically attached PVC roof system with fully-adhered PVC over adhered insulation and r....... |
|
McIntyre IMC Remodeling
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Eau claire, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of remodeling several areas within the University’s Library Building, including a 3900 s.f. Special Collections Suite, ....... |
|
Central Control A/C Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Waupun, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of removal of two existing 5-ton computer room units, the associated 5-ton dry coolers and all associated piping, pumps, ....... |
|
Morrow Baseball Field Conversion
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Platteville, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of demolition of an existing softball field and the construction of a new baseball field, dugouts, and field lighting. Wo....... |
|
Vehicle Storage Garage Sturtevant Transitional Facility
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Sturtevant, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of the preparation of detailed design information and construction of a one story, three bay vehicle storage garage 2,320....... |
|
Parking Lot Pavement Repair Project
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Somers, WI |
Posted:03/03/2006 |
|
Commercial > Building >
In general the work consists of installation of a subgrade drainage system; removal and replacement of asphalt pavement; and pavement marking. This wo....... |
|
1 2 3 4 5 6 7 8 9 10 next
|