| : 171 - 180 of 196 |
Power Search |
|
Provide, install new doors to front entrance, rear entrance,
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Devens, MA |
Posted:09/18/2006 |
|
Commercial > Building >
Provide, install new doors to front entrance, rear entrance, and basement entrance |
|
EXTERIOR PAINTING AND DOOR REPLACEMENT
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Causeway, FL |
Posted:09/18/2006 |
|
Commercial > Building >
Provide all labor, tools, materials, and equipment for the removal and installation of (68) steel doors with fiberglass and preparing and sealing all ....... |
|
Upgrade the Transmitter Building Ventilation (HVAC) System
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Washington, DC |
Posted:09/18/2006 |
|
Commercial > Building >
Work shall include: (a) providing and installing extraction fans in the transmitter bay and (b) adding insulation and seals. As noted below, attac....... |
|
RENOVATE 24AB FOR DOM 35B AND RENOVATE 24C FORDOM 35D
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Chillicothe, OH |
Posted:09/18/2006 |
|
Commercial > Building >
Contractor shall completely prepare the site for building operations including the demolition and removal of existing interior structures and miscella....... |
|
TWO-PHASE DESIGN/BUILD BEQ FOR EOD SCHOOL
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Mobile, AL |
Posted:09/18/2006 |
|
Commercial > Building >
Design and Construct a 58,058 SF single four-story building, interior central corridor consisting of concrete or steel frame and foundation including....... |
|
Remove/Install Carpet & Vinyl Flooring Repair & Paint Walls
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Seattle, WA |
Posted:09/18/2006 |
|
Commercial > Building >
Install vinyl tile in restroom in accordance with the schedule below. Install wall-to-wall new commercial grade carpet squares in office area and ....... |
|
Maintenance Dredging
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Charleston, SC |
Posted:09/18/2006 |
|
Commercial > Building >
Maintenance dredging of approximately 1,569,000 cubic yards of unclassified material from Charleston Harbor Upper Reaches, Shipyard River and TC Dock,....... |
|
Maintenance Dredging
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:New Orleans, LA |
Posted:09/18/2006 |
|
Commercial > Building >
The work consists of the removal and satisfactory disposal of material from the subject limits of the Port Fourchon Navigation Channel, the constructi....... |
|
Hurricane Protection Project, Lake Cataouatche Levee Enlarge
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:New Orleans, LA |
Posted:09/18/2006 |
|
Commercial > Building >
The work consists of clearing and grubbing; placing uncompacted and compacted embankment on the existing levee crown; fertilizing, seeding, and mulchi....... |
|
New Orleans Area Plan Emergency Restoration, Rehabilitation
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:New Orleans, LA |
Posted:09/18/2006 |
|
Commercial > Building >
Description of Work: Rehabilitation of various mechanical, electrical and site work damages by Hurricane Katrina, to pre-storm condition, at fifteen (....... |
|
prev 11 12 13 14 15 16 17 18 19 20
|