Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 101 - 110 of 535 Power Search
Constructing one enclosed office   Aerial Photo Jobsite Map Phone
Location:Grand Rapids, MN Posted:02/15/2006
Commercial > Building > Constructing one enclosed office. Install electrical outlets, switches, lay-in ceiling and lighting. Modify existing baseboard heating and HVAC supply diffuser system.
Steam System Modifications   Aerial Photo Jobsite Map Phone
Location:Bayport, MN Posted:02/15/2006
Commercial > Building > New Boilers and Steam System Modifications MCF-Stillwater, 970 Pickett St. N., Bayport MN.PRE-BID MEETING DATE: 02/17/06 at 09:00 AM CST Mandatory.
CHAIN LINK FENCING   Aerial Photo Jobsite Map Phone
Location:Minneapolis, MN Posted:02/15/2006
Commercial > Building > To furnish, deliver and install chain link fencing, parts and repairs for various City of Minneapolis departments.
EDGEWATER PARK IMPROVEMENTS   Aerial Photo Jobsite Map Phone
Location:Minneapolis, MN Posted:02/15/2006
Commercial > Building > To furnish all labor, materials, equipment and incidentals necessary to accomplish the construction of park improvements at Edgewater Park. The projec.......
Ramp Project   Aerial Photo Jobsite Map Phone
Location:Grand Rapids, MI Posted:02/15/2006
Commercial > Building > The project consist of the installation of pedestrian walkway. Work includes, but is not necessarily limited to, asphalt removal, vegetation and site .......
Fletcher St. Parking Structure Critical Structural Repairse   Aerial Photo Jobsite Map Phone
Location:Ann Arbor, MI Posted:02/15/2006
Commercial > Building > The University of Michigan Fletcher St. Parking Structure Critical Structural Repairs
WATER MAIN LEAK REPAIR   Aerial Photo Jobsite Map Phone
Location:Ann Arbor, MI Posted:02/15/2006
Commercial > Building > WATER MAIN LEAK REPAIR – Arbor Heights Center, 1447 Washington Heights, Ann Arbor.MANDATORY WALK-THROUGH: Tuesday, March 7, 2006 at 10:00 a.m. local time at the site.
HVAC preventive maintenance   Aerial Photo Jobsite Map Phone
Location:Bangor, ME Posted:02/15/2006
Commercial > Building > HVAC preventive maintenance at the Dorothea Dix Psychiatric Center in Bangor. A mandatory pre-bid meeting involving interested bidders and representat.......
Water Distribution System Improvements   Aerial Photo Jobsite Map Phone
Location:Shreveport, LA Posted:02/15/2006
Commercial > Building > Phase I – 36” Water Main: Walker Rd. to St. Vincent Ave. The purpose of this project is to install approximately 21,000 linear feet of 36" Water M.......
Road construction project   Aerial Photo Jobsite Map Phone
Location:Owensboro, KY Posted:02/15/2006
Commercial > Building > Supplier to provide integrally formed biaxial georgrid for use in a road construction project.
prev   11    12   13   14   15   16   17   18   19   20   next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500