Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 91 - 100 of 139 Power Search
Pavement Improvement Project   Aerial Photo Jobsite Map Phone
Location:Ocean Shores, WA Posted:06/19/2007
Commercial > Building > The work under this Contract includes all labor, materials, equipment, supplies, and services to provide the Construction of approximately 17 miles of.......
Coal Creek Parkway - Phase 2   Aerial Photo Jobsite Map Phone
Location:Newcastle, WA Posted:06/19/2007
Commercial > Building > This project will reconstruct and widen Coal Creek Parkway from SE 84th Way to SE 91st Street including new asphalt pavement, curb & gutters, sidewalk.......
Coal Creek Parkway - Phase 3   Aerial Photo Jobsite Map Phone
Location:Newcastle, WA Posted:06/19/2007
Commercial > Building > Federal funding is one of the sources of funding for this phase of the project. The project will reconstruct and widen Coal Creek Parkway from SE 91st.......
Improvements to the Water Tower   Aerial Photo Jobsite Map Phone
Location:Lynnwood, WA Posted:06/19/2007
Commercial > Building > Grade area around Water Tower as required to install new entry ramp to south entry door. Install new retaining wall with backfill to allow for future .......
On-Call Pavement Pavement Patching   Aerial Photo Jobsite Map Phone
Location:Lakewood, WA Posted:06/19/2007
Commercial > Building > Work includes, but is not limited to: roadway milling or pavement removal, hot mix asphalt concrete paving, striping, and all other necessary work to .......
Sidewalk Improvements   Aerial Photo Jobsite Map Phone
Location:Lakewood, WA Posted:06/19/2007
Commercial > Building > Cement concrete sidewalk and half street improvements on 86th Street SW from Bridgeport Way SW to Lochburn Middle School. Work includes but is not lim.......
Water System Improvement Project   Aerial Photo Jobsite Map Phone
Location:Kenmore, WA Posted:06/19/2007
Commercial > Building > The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of th.......
Corridor Improvements   Aerial Photo Jobsite Map Phone
Location:Kenmore, WA Posted:06/19/2007
Commercial > Building > This contract provides for the SR 522 Corridor Improvements, Phase 1, Stage 3 73rd Ave NE - MP 7.26 to MP 7.60, including the realignment of 73rd Ave .......
Sewer System Replacement   Aerial Photo Jobsite Map Phone
Location:Everett, WA Posted:06/19/2007
Commercial > Building > Construction of approximately 6,130 linear feet of combined sewer pipe and approximately 2,700 linear feet of water main.
Carpet Replacement   Aerial Photo Jobsite Map Phone
Location:Everett, WA Posted:06/19/2007
Commercial > Building > The work involves documentation of existing furniture locations and condition, moving of furniture to temporary location(s) within the work area or ad.......
1   2   3   4   5   6   7   8   9   10    next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500