| : 91 - 100 of 699 |
Power Search |
|
Development Services-Mt Baker Theatre
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bellingham, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Design Development Services-Mt Baker Theatre |
|
Lighting Renovation
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bellingham, WA |
Posted:06/23/2006 |
|
Commercial > Building >
This project includes renovation of historical lighting in the lobby and the 1500 seat main theatre space of the historic Mount Baker Theatre |
|
Restoration Water Main Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bellingham, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Project includes installation of a 16-inch diameter, Ductile Iron hanging water main in the Eldridge Street Bridge over Squalicum Creek and testing an....... |
|
Civic Field Complex Improvements
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bellingham, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Civic Field Complex Improvements - Skate Park Additions, Base bid consists of an addition of a street course. Alternate number one is a bowl additon to skatepark |
|
Renovation Of Joe Martin Field
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Bellingham, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Complete renovation of Joe Martin Field with new sub-drainage syste, topsoil, and sodding. |
|
Construction of the Sunnyside Reservoir
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Marysville, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Construction of the Sunnyside Reservoir, complete and operational, including all testing, disinfection, training, warranty and startup services. The w....... |
|
Sewer Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Marysville, WA |
Posted:06/23/2006 |
|
Commercial > Building >
The work involves replacement of antiquated sewer main. The work will be conducted at two separate sites as follows: Trunk G Sewer Rehabilitation - Al....... |
|
tile flooring
|
Email
Phone
|
|
Location:lake orion, MI |
Posted:06/23/2006 |
|
Residential > Flooring >
We want to tile our kitchen , dinning hallway entrance and 2 bathroom's . It's about 500 sq.ft |
|
Terrace Ridge Lift Station & Sewer Reconstruction
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:, WA |
Posted:06/23/2006 |
|
Commercial > Building >
Major items of work include installation of an Owner-provided 10ft diameter steel package pump station, above ground control cabinet, 180 feet of 8" d....... |
|
Sewer Trestle Repair and Replacement
|
Aerial Photo
Jobsite Map
Phone
|
|
Location:Olympia, WA |
Posted:06/23/2006 |
|
Commercial > Building >
This project consists of the replacement of a 70-foot trestle for a sewer line and the maintenance repair of a 200-foot-wide trestle |
|
1 2 3 4 5 6 7 8 9 10 next
|