Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 91 - 100 of 699 Power Search
Development Services-Mt Baker Theatre   Aerial Photo Jobsite Map Phone
Location:Bellingham, WA Posted:06/23/2006
Commercial > Building > Design Development Services-Mt Baker Theatre
Lighting Renovation   Aerial Photo Jobsite Map Phone
Location:Bellingham, WA Posted:06/23/2006
Commercial > Building > This project includes renovation of historical lighting in the lobby and the 1500 seat main theatre space of the historic Mount Baker Theatre
Restoration Water Main Replacement   Aerial Photo Jobsite Map Phone
Location:Bellingham, WA Posted:06/23/2006
Commercial > Building > Project includes installation of a 16-inch diameter, Ductile Iron hanging water main in the Eldridge Street Bridge over Squalicum Creek and testing an.......
Civic Field Complex Improvements   Aerial Photo Jobsite Map Phone
Location:Bellingham, WA Posted:06/23/2006
Commercial > Building > Civic Field Complex Improvements - Skate Park Additions, Base bid consists of an addition of a street course. Alternate number one is a bowl additon to skatepark
Renovation Of Joe Martin Field   Aerial Photo Jobsite Map Phone
Location:Bellingham, WA Posted:06/23/2006
Commercial > Building > Complete renovation of Joe Martin Field with new sub-drainage syste, topsoil, and sodding.
Construction of the Sunnyside Reservoir   Aerial Photo Jobsite Map Phone
Location:Marysville, WA Posted:06/23/2006
Commercial > Building > Construction of the Sunnyside Reservoir, complete and operational, including all testing, disinfection, training, warranty and startup services. The w.......
Sewer Replacement   Aerial Photo Jobsite Map Phone
Location:Marysville, WA Posted:06/23/2006
Commercial > Building > The work involves replacement of antiquated sewer main. The work will be conducted at two separate sites as follows: Trunk G Sewer Rehabilitation - Al.......
tile flooring   Email Phone
Location:lake orion, MI Posted:06/23/2006
Residential > Flooring > We want to tile our kitchen , dinning hallway entrance and 2 bathroom's . It's about 500 sq.ft
Terrace Ridge Lift Station & Sewer Reconstruction   Aerial Photo Jobsite Map Phone
Location:, WA Posted:06/23/2006
Commercial > Building > Major items of work include installation of an Owner-provided 10ft diameter steel package pump station, above ground control cabinet, 180 feet of 8" d.......
Sewer Trestle Repair and Replacement   Aerial Photo Jobsite Map Phone
Location:Olympia, WA Posted:06/23/2006
Commercial > Building > This project consists of the replacement of a 70-foot trestle for a sewer line and the maintenance repair of a 200-foot-wide trestle
1   2   3   4   5   6   7   8   9   10    next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500