Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 1 - 10 of 168 Power Search
Stairs   Email Phone
Location:hamilton, NJ Posted:10/21/2006
Residential > Additions & Remodels > Update stairs. Replace bottom step, replace banisters and hand rails. Possibly reconstruct if affordable.
SYSTEM ENHANCEMENT   Aerial Photo Jobsite Map Phone
Location:Apache County, AZ Posted:10/20/2006
Commercial > Building > The proposed work includes stabilizing the existing slope by excavating the unstable rock mass and creating a bench to contain future rockfall.
CONSTRUCT QUIET PAVEMENT PHASE VIII   Aerial Photo Jobsite Map Phone
Location:Maricopa County, AZ Posted:10/20/2006
Commercial > Building > The project includes the segment of I-10 from Van Buren Street to Baseline Road. The total project length is 7.78 miles. The proposed work consists of.......
SYSTEM ENHANCEMENT - TRAFFIC MGMT AND ENGINEERING   Aerial Photo Jobsite Map Phone
Location:Maricopa County, AZ Posted:10/20/2006
Commercial > Building > The work includes installation of conduit, pull boxes, innerduct, fiber optic cables, closed-circuit television cameras, and variable message signs.
CONST TRAFFIC SIGNAL   Aerial Photo Jobsite Map Phone
Location:Yuma County, AZ Posted:10/20/2006
Commercial > Building > This project includes the construction of a traffic signal system at the intersection of US 95 and Avenue G. This project also includes widening Avenu.......
CNST SIDEWALK   Aerial Photo Jobsite Map Phone
Location:Ajo, AZ Posted:10/20/2006
Commercial > Building > The work includes removing existing concrete curb and gutter, concrete slabs, asphaltic concrete pavement, and catch basins; furnishing and placing as.......
MILL & REPLACE   Aerial Photo Jobsite Map Phone
Location:Yuma County, AZ Posted:10/20/2006
Commercial > Building > The proposed work includes milling and overlaying of the existing pavement, removing or replacing cattle guard, installing new embankment curb and reconstructing guardrail.
TI IMPROVEMENTS   Aerial Photo Jobsite Map Phone
Location:Phoenix, AZ Posted:10/20/2006
Commercial > Building > The work consists of widening AC and PCCP pavement to construct new right turn lanes, AC and PCCP pavement rehabilitation, bridge widening, median isl.......
DRAINAGE IMPROVMENTS   Aerial Photo Jobsite Map Phone
Location:Mohave County, AZ Posted:10/20/2006
Commercial > Building > The work consists of storm drain improvements including roadway excavation, removal and disposal of asphaltic concrete pavement and excavated material.......
SELIGMAN HIGHWAY   Aerial Photo Jobsite Map Phone
Location:Mohave County, AZ Posted:10/20/2006
Commercial > Building > The work consists of constructing sidewalk, Asphaltic concrete (miscellaneous paving), retaining wall, PVC pipe, curb and gutter, driveway entrances, .......
1    2   3   4   5   6   7   8   9   10   next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500