Construction and Home Improvement Community
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login
 
Project Search Result : 1 - 10 of 329 Power Search
the lake group   Email Phone
Location:manchester, MI Posted:09/08/2006
Residential > Roofing & Gutters > We need about 400 ft of large gutter and down spout.
TIFFANY PARK ACTIVITY BUILDING   Aerial Photo Jobsite Map Phone
Location:Renton, WA Posted:09/08/2006
Commercial > Building > The project consists of construction of a replacement park activity building in Renton. An existing building on site will be removed and the area roug.......
Main Terminal Freight Elevator 3F Modernization   Aerial Photo Jobsite Map Phone
Location:Port Of Seattle, WA Posted:09/08/2006
Commercial > Building > The Work includes the Main Terminal Elevator 3F Modernization (MT-3F) project modernizes the existing elevator cab, controls and elevator equipment wi.......
Gateway Center   Aerial Photo Jobsite Map Phone
Location:Kirkland, WA Posted:09/08/2006
Commercial > Building > The construction of approximately 72,520 square foot medical office building with 611 stall parking garage associated with a Sound Transit/ King County Metro transit center
Construct New Viticulture Greenhouse   Aerial Photo Jobsite Map Phone
Location:Prosser, WA Posted:09/08/2006
Commercial > Building > Construct a new greenhouse facility, 2,100 s.f. manufactured aluminum frame greenhouse glazed with polycarbonate. Sitework, concrete slabs and footing.......
Replace Greenhouse Glazing System   Aerial Photo Jobsite Map Phone
Location:Pullman, WA Posted:09/08/2006
Commercial > Building > Replace polycarbonate roof panels. Work includes removing all trim holding polycarbonate roof panels in place and installing new polycarbonate roof panels and trim
MHSC AA Wing Minus One MRI Replacement   Aerial Photo Jobsite Map Phone
Location:Seattle, WA Posted:09/08/2006
Commercial > Building > Work entails working in Shipping and Receiving space on First Floor directly above, removal and re-installation of sheet steel and pre-cast concrete p.......
New Snohomish High School   Aerial Photo Jobsite Map Phone
Location:Snohomish, WA Posted:09/08/2006
Commercial > Building > Contractor to Provide labor, materials, and equipment For A new approximately 245,000 sq.ft. high school
Information Technology Center   Aerial Photo Jobsite Map Phone
Location:Puyallup, WA Posted:09/08/2006
Commercial > Building > Work includes site clearing and grubbing, grading, site utilities and service connections, paving, landscaping and irrigation, building foundations,, .......
Legislative Building Rehabilitation   Aerial Photo Jobsite Map Phone
Location:Olympia, WA Posted:09/08/2006
Commercial > Building > Contractor to Provide labor, materials, and equipment For Renovation of Pritchard Ramp
1    2   3   4   5   6   7   8   9   10   next   
 
 
 
 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500