Construction and Home Improvement Community
Home :: Contractors :: General Requirements :: Engineers :: Structural :: FARINA FORMWORK SYSTEM
Projects Go Shopping Career Center Resources Forums Products Contractors
  :: Please Register or Sign-in ::
Owners    Workers   Suppliers    Contractors  
 Contact Us |   Sitemap | Login



Get Listed and Find Project Leads  

FARINA FORMWORK SYSTEM

Address:

Via grandi 7
Milan, Int 20097
Add Favorite

Phone:

025-275-829

Fax:

+390255600291

Year Established:

30

Project Type:

Farina formwork

Typical Project Size:

Farina formwork

Labor Affiliation:

Farina formwork

Company Description:

Farina Casseforme have been designing and producing equipment for the construction industry for more than thirty years: not just formwork frames, customised formwork, shoring systems, hydraulic bridge cranes for various construction types of varying sizes, but also light and heavyweight structural steelwork, which range from metal mezzanines structures to modular industrial steel warehouses. They offer a global consultancy service which works together with construction companies, engineering companies and Industries, both in Italy and worldwide. Farina Casseforme was founded in 1973, thanks to the enterprising spirit of Claudio Farina, who has been directing the company with great enthusiasm for more than thirty years, promoting it as a reference point in the sector of the manufacturing of metal alloys. The plant at San Donato Milanese, on the outskirts of Milan, covers an area of 12.000m2, 8000m2 of which are covered by warehouses and industrial buildings and 4000m2 with large yards and green areas. The company nucleus is comprised of 50 employees who operate in an administrative, design and a production capacity and who are capable of undertaking projects of standard production and those more specialised. The technical office provides a consultancy service which starts with the preliminary survey stage and covers all design and production phases and site supervision.

Project History:

“DESTIL” framed formwork is a new system for efficient concrete construction technology and is now available for sale. “DESTIL” offers increased efficiency and reduces costs through the following: - MODULARITY: avaible in heights of 300 cm , 120 cm and on demand 330 cm and 270 cm. Wide range for every sizes of steel frame - STEEL: Highly resisting Steel, type S355MC Admissible load 80kN/m2 . Thickness: 2.50 mm Finishing technique: Hot Zinc-coat A strong and quick system for heavy duty - HIGH COMPATIBILITY with other formwork systems currently leader on the market - NEW CONCRETE FINISHES: thanks to an innovative steel profile, we have improved visible concrete surfaces. Destil Formwork for Works of Art - LONG LIFE: Frames and profiles are hot deep galvanised both inside and outside - LOW DENSITY OF TIE RODS: you need only 2 tie rods for concreting heights up to 330 cm panel - LARGE-AREA CRANE OPERATION: versatile, quickly assembled and movable in large units. Destil is used on both small and large construction sites - HIGH-QUALITY PLYWOOD: finn quality-plywood or a plastic-coated plywood that lives 3 times longer - CONNECTIONS: singular geometry of steel profile allows the connection of different steel frame modules in any position by Quick-acting clamp and Multi-function clamp - CORNERS AND CIRCULAR WALLS: all corners, articulated corners and panels for circular walls or columns are avaible - TECHNICAL ASSISTENCE pre- and post-selling - VERY GOOD PRICE - ACCESSORIES: full range and interchangeability of all accessories - SPEED: Fast system for Walls, Columns and Slabs. Rapid planting, removing and moving on-site of formwork. The construction time is reduced by 25% compared to conventional methods. - REUTILIZATION: High number of possible reutilization (over 300) This steel frame system allows the construction of the following: - Vertical formworks - Horizontal formworks - Formworks supported by shoring system - Climbing formworks suitable for towers and bridge piers - Dam formworks - Formworks suitable for construction of elevator shaft - Single-sided wall formworks - Tunnel formwork

Other Categories:

Concrete >> Formwork
Back
banner


Sponsors

Sponsorship Ad Storefront Doors
 
Sponsorship Ad Service Angel
 
Sponsorship Ad Gas Light Guys
 
Sponsorship Ad Building Information Modeling
 
Sponsorship Ad US Appliance
 
Sponsorship Ad Advertise here
 
Sponsorship Ad Tradesmen International
 
Sponsorship Ad Home Appliance Center
 
Sponsorship Ad Career Counseling
 
Sponsorship Ad Nail Gun Depot
 

 
©ConstructionWork.com - All Rights Reserved. If you have any questions, please call us at 1.843.225.2500